Home/Scaffolder/Guides/Roof Scaffolding — UK Cost & Access Guide

Erect roof scaffolding.

Roof-edge protection and access scaffold — for re-tiling, leadwork or chimney repair.

Where is the job?
✓ Updated May 2026✓ Free quotes✓ Vetted pros
20,000+UK homeowners
50,000Quotes sent
Keep going

Hire a scaffolder. CISRS-carded, NASC-checked.

Read the brief on cards, designs, inspections and licences — then let three NASC scaffolders quote.

Instant
01 · Ask

Single side or whole house?

Roof work, chimney, render? Describe the project and the AI tells you the right scaffold spec.

Free
02 · Read the brief

Walk in informed

TG20 designs, SG4 inspections, CISRS cards, pavement licences. Know what compliance looks like.

60 seconds
03 · Compare

Compare 3 scaffolder quotes

Three NASC scaffolders quote on the same spec — duration, design, inspections, licence — so you compare cleanly.

Ready when you are

Enter your postcode and get free quotes from local pros.

Get scaffolder quotes
Top tips

Hiring a scaffolder, without the regret.

Four moves that separate a smooth job from a nightmare.

CISRS-card holders only.

Every scaffolder on site needs a CISRS card. No card = no insurance cover if there's an accident. Insist on seeing them.

Get the design drawing.

Any scaffold over 38m, or non-standard, needs a TG20 design or bespoke drawing. Without it, the scaffold isn't compliant — and your project isn't either.

Daily inspection certificate.

Working scaffolds need a SG4-compliant inspection at handover and every 7 days. Insist on the signed inspection paperwork.

Check pavement licence.

Anything on pavement or road needs a council pavement licence (£70–£300). Scaffolder usually arranges; check it's in place before they start.

Costs & timeline

Know what it costs. Know when it ends.

Indicative UK ranges and what affects price.

Cost range

By job type

Inc. VAT · 2026
Source: NMT quotes
Domestic scaffold (1 side, 1 week)
£400–£900
Whole house scaffold (1 week)
£1.2k–£2.5k
Chimney access tower
£400–£900
Roof edge protection only
£600–£1.5k
Weekly extension (per week)
£50–£150
Pavement licence (council fee)
£70–£300
!

Quote spread is typically ± 18% — always get 3 quotes.

At a glance

The Scaffolder briefing.

Infographic · Video
Infographic

Scaffolder quick-view

Roof Scaffolding — UK Cost & Access Guide infographic
Video guide

Scaffolder explained

Roof scaffolding — full perimeter edge protection for roof works. Building Regs compliant. Expect to pay £600–£3,000 for UK roof scaffolding.

What Does the Work Involve?

CISRS-trained scaffolder. Tube and fitting around full perimeter. Toe boards and double handrail. Often includes lift to gutter and one to ridge. 1-4 week hire standard. SG4 compliant.

Typical Costs

ItemLow (£)High (£)Notes
Semi-detached roof scaffold6001,5001-2 week hire
Detached roof scaffold1,0002,500Larger
Three-storey townhouse1,5003,500Higher
Bungalow roof scaffold5001,200Lower height
Roof + gable scaffold combined8002,500Combined access
Lift platform only (Pasma tower)200800DIY alternative
Extra week hire50200Per week beyond standard

UK Regulations

Working at Height Regs 2005. SG4. TG20:21. CDM 2015 for major. Council pavement licence if on road.

Frequently Asked Questions

Tower or scaffold for roof?

Roof tiling/repair: scaffold for safety. Quick inspection: tower OK.

Edge protection mandatory?

Yes — working at height. Toe boards and handrails. SG4 compliant.

Combined with roof project?

Roofer arranges typically. Quote includes scaffold.

How long does erection?

Roof scaffold: half-day to 1 day. Dismantle: half day.

Pavement licence required?

If on public road: yes. Council £100-£300. Provider arranges.

Insurance level?

£5m public liability minimum. £10m commercial.

This guide was written with AI assistance and is intended for general information only. Prices are estimates based on UK averages and may vary by region. Always get at least three quotes and consult a qualified professional before starting any work.

NEWAI Trade Assistant

Got more questions
about scaffolder?

Ask follow-ups in plain English. The AI explains options, sequencing and what to ask the scaffolder — so you walk in informed.

I'm planning a job. Should I be looking for a scaffolder?
Sounds like a job for scaffolder. Tell me what you're trying to do — I'll walk you through costs, timeline and what to ask before they start.
FREE QUOTES60 SECONDS