Home/Electrician/Guides/EV Charger Part S — UK New Build & Renovation Guide

Install an EV charger to Part S.

Building Regs Part S compliant install — required on new builds and major renovations from June 2022.

Where is the job?
✓ Updated May 2026✓ Free quotes✓ Vetted pros
20,000+UK homeowners
50,000Quotes sent
Keep going

Hire an electrician. Without the rewire surprise.

From a single dodgy socket to a full rewire — read the brief, then let Three local electricians quote.

Instant
01 · Ask

Spot the warning signs

Buzzing fuse box, hot sockets, lights flickering when you boil the kettle. Describe it in plain English — the AI tells you if it's a 30-min fix or a rewire.

Free
02 · Read the brief

Walk in informed

Part P, EIC vs EICR, C1/C2/C3 ratings, when Building Control gets involved. Know the lingo before the quote arrives.

60 seconds
03 · Compare

Compare 3 electrician quotes

Up to Three local electricians come back with itemised quotes — call-out, materials, labour, certificate fee. No flat-rate guesses.

Ready when you are

Enter your postcode and get free quotes from local pros.

Get electrician quotes
Top tips

Hiring a electrician, without the regret.

Four moves that separate a smooth job from a nightmare.

Check NICEIC or NAPIT registration.

Part P electrical work must be certified by a registered electrician. NICEIC and NAPIT are the two big ones — verify online before they start.

Demand the EIC certificate.

Any new circuit or consumer unit change needs an Electrical Installation Certificate (EIC). Without it, you can't sell the house cleanly.

Get the EICR before buying.

An Electrical Installation Condition Report on a house you're buying flags hidden rewire jobs. A C1 or C2 finding is a £2k–£8k negotiation lever.

Don't accept a quote without a survey.

Honest electricians lift a few floorboards before quoting a rewire. Anyone quoting a flat rate over the phone is guessing.

Costs & timeline

Know what it costs. Know when it ends.

Indicative UK ranges and what affects price.

Cost range

By job type

Inc. VAT · 2026
Source: NMT quotes
Hourly call-out rate
£50–£100/hr
Day rate
£250–£450/day
New socket or light fitting
£80–£200
Consumer unit upgradeInc. RCDs + cert
£600–£1.5k
EICR full report3-bed house
£150–£400
Full house rewire3-bed, plaster making-good extra
£3.5k–£8.5k
!

Quote spread is typically ± 18% — always get 3 quotes.

At a glance

The Electrician briefing.

Infographic · Video
Infographic

Electrician quick-view

EV Charger Part S — UK New Build & Renovation Guide infographic
Video guide

Electrician explained

UK Building Regulations Part S — Infrastructure for Charging Electric Vehicles — mandates EV chargepoints on new builds and major renovations. Effective June 2022 with ongoing strengthening. Expect to pay £800–£1,500 for a UK Part S compliant EV chargepoint install.

What Does the Work Involve?

OZEV-authorised installer. Site survey. 7kW or 22kW chargepoint. RCD protection. Tethered or untethered. Smart functionality mandatory. NICEIC/NAPIT certificate. Building Regs sign-off for new build.

Typical Costs

ItemLow (£)High (£)Notes
7kW chargepoint + install8001,500Standard home
22kW chargepoint + install1,5003,0003-phase supply
Untethered (universal cable)+£100+£300Vs tethered
OZEV grant (renter/flat)-£350-£350Funded
New build inclusion (Part S)includedincludedIn build cost
3-phase supply upgrade2,00010,000+If needed
Smart EV charger premium+£200+£600Solar-aware

UK Regulations

Building Regs Part S since 15 June 2022. Mandatory for new dwellings with associated parking. 1 chargepoint per dwelling with parking. Major renovations: cable routes for future chargepoint. NICEIC/Part P certificate.

Frequently Asked Questions

Required on new builds?

Yes — every new dwelling with parking space must have chargepoint or readiness.

Best UK chargers?

Pod Point, ohme, Easee, Wallbox, Andersen. OZEV-approved list.

OZEV grant eligibility?

Renters and flat-dwellers: £350 grant continues 2026. Homeowners: ended 2022.

Smart functionality mandatory?

Yes — Smart Charge Point Regs 2021. Default off-peak charging. Cybersecurity.

22kW worth premium?

Only if 3-phase supply available. Most UK domestic 1-phase = 7kW max.

Solar-integration smart?

Yes — premium models charge from solar surplus. £200-£600 premium.

This guide was written with AI assistance and is intended for general information only. Prices are estimates based on UK averages and may vary by region. Always get at least three quotes and consult a qualified professional before starting any work.

NEWAI Trade Assistant

Got more questions
about electrician?

Ask follow-ups in plain English. The AI explains options, sequencing and what to ask the electrician — so you walk in informed.

I'm planning a job. Should I be looking for an electrician?
Sounds like a job for electrician. Tell me what you're trying to do — I'll walk you through costs, timeline and what to ask before they start.
FREE QUOTES60 SECONDS